P3 Ostrava Central
![](https://www.msid.cz/wp-content/uploads/2024/01/ostrava_p3_1_600021-1024x1024.jpg)
After a demanding renovation, the 44-hectare brownfield is ready for the construction of a modern and commercial industrial park, which will bring life back to the abandoned locality and become part of the city. Thanks to the design of the award-winning architect David Kotek (Projektstudio), the industrial zone will naturally connect to the nearby centre and to the unique appearance of the Agglomeration, which was imprinted on it by the architect Josef Pleskot. We build with respect for history and the surrounding buildings.
Space specification according to client requirements:
- Variable units from 1,500 m2
- Sprinkler system
- Infrared emitters /ceiling heating units
- A flexible layout of offices with air conditioning
- Column module: 24 × 12 m
- Clear height of storage areas: 10-20 m
- Loading yard: 35 m
- Floor load: 5t/m2
- A minimum of 1 loading ramp with one loading bridge per 1,000 m2 of storage space
- BREEAM Very Good
Benefits of P3 OSTRAVA CENTRAL
- A functional railway along the eastern perimeter of the compound
- Large electrical input capacity of up to 50 MW
- Flexible unit layouts
- The zoning plan does not limit the height of the buildings
- Near the tram Důl Jeremenko a Český dům
- Nearby a planned bike path along the Ostravice river
- A large number of parking spaces for cars
- Three entrances to the park via the roundabout from Hornbach, Rudná Street, Místecká Street and Halasova Street
- Sustainability trend in the form of building certification according to BREEAM
- Over 130,000 m2 of green space
- Multiple rest areas created within the park
- Parking spaces for trucks
- Public charging points for electric cars, type AC, power 22W available
- Possibility to use large quantities of non-potable water
Basic information
Type
Buildings
Area
44 ha
Intention
Lease
Ownership
Private
Purpose
Light industry Logistics Office
Current situation
Initial phase
Advanced phase
Preparation completed
Information materials
![](https://www.msid.cz/wp-content/uploads/2024/01/dji_0642-1-300x200.jpg)
P3 Ostrava Central
Document: Image
Download
![](https://www.msid.cz/wp-content/uploads/2024/01/dji_0639-1-300x200.jpg)
P3 Ostrava Central
Document: Image
Download
![](https://www.msid.cz/wp-content/uploads/2024/01/dji_0632-1-300x200.jpg)
P3 Ostrava Central
Document: Image
Download
![](https://www.msid.cz/wp-content/uploads/2024/01/dji_0606-1-300x200.jpg)
P3 Ostrava Central
Document: Image
Download
![](https://www.msid.cz/wp-content/uploads/2024/01/dji_0631-1-300x200.jpg)
P3 Ostrava Central
Document: Image
Download
![](https://www.msid.cz/wp-content/uploads/2024/01/dji_0603-1-300x200.jpg)
P3 Ostrava Central
Document: Image
Download
![](https://www.msid.cz/wp-content/uploads/2024/01/6img4379-1-300x200.jpg)
P3 Ostrava Central
Document: Image
Download
![](https://www.msid.cz/wp-content/uploads/2024/01/6img4340-1-300x200.jpg)
P3 Ostrava Central
Document: Image
Download
![](https://www.msid.cz/wp-content/uploads/2024/01/6img4420-1-300x200.jpg)
P3 Ostrava Central
Document: Image
Download
![](https://www.msid.cz/wp-content/uploads/2024/01/6img4455-1-300x200.jpg)
P3 Ostrava Central
Document: Image
Download
![](https://www.msid.cz/wp-content/uploads/2024/01/6img4448-1-300x200.jpg)
P3 Ostrava Central
Document: Image
Download
![](https://www.msid.cz/wp-content/uploads/2024/01/6img4458-1-300x200.jpg)
P3 Ostrava Central
Document: Image
Download